New Local Plan for Thurrock

Evidence to support the Local Plan

Local plans must be based on strong evidence.

We carry out detailed technical studies on the characteristics of each area, including:

  • social
  • economic
  • environmental

Our Issues and Options (Stage 2) consultation showed how studies have helped with the plan-making process so far. We have commissioned a range of further studies to help us to prepare the Local Plan.

You can download current technical studies below. Further studies will be added when completed.

Design and heritage

Economy

Flooding and water management

Thurrock Water Cycle Study Scoping Report, March 2024 (PDF 45.7MB)

Thurrock Level 1 Strategic Flood Risk Assessment (SFRA), January 2024 – part revised July 2024

Thurrock Level 1 SFRA, January 2024 – main report and appendices, part revised July 2024

Health and well-being

Housing

Infrastructure and viability

Local Plan Viability Update, March 2023 (PDF 32.7MB)

Natural environment

Thurrock Green and Blue Infrastructure Strategy, 2022/23 update, February 2023 (PDF 31.2MB)

Thurrock Integrated Landscape Character Assessment, October 2018

Integrated Landscape Character Assessment, October 2018: introductory chapters and appendices (PDF 28.3MB)

Integrated Landscape Character Assessment, October 2018: landscape character profiles (PDF 19.9MB)

Transport

Grays Town Centre Transport Study, June 2023 (PDF 20.4MB)

Local Plan Site Appraisals: Site Connectivity Assessment, February 2023 (PDF 77.0MB)

Local Transport Plan Evidence: Baseline Study, May 2021 (PDF 23.8MB)