Freedom of information response

Highway Structure

Publication date: 
Wednesday 8 May 2024
Request: 

•    The number of Highway bridges on your general inspection rota.
•    The number of retaining walls over 2m tall maintained by the council
•    The number of Highway culverts inspected as part of your general inspection rota
•    The number of personnel in your Highway Structures team - (or personnel specifically responsible for Highway structures)
•    The tite and salary scale grades for the positions in the Highway Structures Team

Response: 

•         The number of Highway bridges on your general inspection rota.

  • Total number of highway bridges – 92
  • Total number in 2023/24 rota - 12

•         The number of retaining walls over 2m tall maintained by the council

- 22

•         The number of Highway culverts inspected as part of your general inspection rota

  • Total number of culverts – 29
  • Total number in 2023/24 rota – 5.

•         The number of personnel in your Highway Structures team - (or personnel specifically responsible for Highway structures)

There are no dedicated structures team and staff in the roles listed share the delivery of that service.

Request reference:
FOI 13732